Mining Development
Your location:Home >Service> Mining Development

   Under the strategic work arrangement of accelerating industrial development, running pillar industry bigger and stronger, Inner Mongolia Mineral Experiment Research Institute ( Inner Mongolia Geology and Mineral Technology Co., Ltd) relied on its own technical advantages to make mining development finally realize the production mode of large-scale and intensified by increasing equipment replacement force and excavating available production capacity in the mine, effectively improving efficiency of resource utilization, winning market recognition and obtaining greater economic and social benefits. 

    Up to the present, Inner Mongolia Mineral Experiment Research Institute (Inner Mongolia Geology and Mineral Technology Co., Ltd) constructed Gold Stone Mining Industry Co.ltd of Inner Mongolia with daily ore processing capacity of 500 tons and Guangyuan Mining Industry Co.ltd. of Chayouzhongqi, Inner Mongolia with annual ore processing capacity of 150,000 tons. During the eleventh five-year plan period, the total ore processing amount is 1.4 million tons, realizing a total income of 213 million RMB.

   In recent years, the company carried out ore prospecting in surrounding areas with self-raised funds. A major breakthrough was made in Xiaoxigou in 2011 with two gold orebodies preliminarily controlled and the orebodies are not closed. According to current resources and reserves, the company is expanding a flotation plant with daily ore processing capacity of 1000 tons.

   Service items:Stope design, ore dressing plant design, installation and technical process reconstruction as well as equipment commissioning.  

Address: No.16 Zhaojun Road, Yuquan District, Hohhot, Inner Mongolia

Tel: 0471-5685032 Fax: 0471-5685193

Copyright: Inner Mongolia Mineral Experiment Research Institute (Inner Mongolia Geology and Mineral Technology Co., Ltd) Technical Support: Daqi Website

About Us  |  Fair statement  |  Advice  |  Contact Us